{"id":"CVE-2025-1273","state":"PUBLISHED","title":"PDF File Parsing Heap-Based Overflow Vulnerability","description":"A maliciously crafted PDF file, when linked or imported into Autodesk applications, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process.","publishedAt":"2025-04-15T20:56:04.970Z","updatedAt":"2026-02-26T18:28:17.193Z","severity":{"score":7.8,"label":"High","version":"3.1","vector":"CVSS:3.1/AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H","source":"autodesk"},"assigner":"autodesk","products":["Autodesk Revit","Autodesk AutoCAD","Autodesk AutoCAD LT","Autodesk AutoCAD Architecture","Autodesk AutoCAD Electrical","Autodesk AutoCAD MAP 3D","Autodesk AutoCAD Mechanical","Autodesk AutoCAD MEP","Autodesk AutoCAD Plant 3D","Autodesk Civil 3D","Autodesk Advance Steel"],"affected":[{"vendor":"Autodesk","product":"Revit","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.4.1","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.3.2","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.7","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:revit:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:revit:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:revit:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD LT","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_lt:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_lt:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_lt:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD Architecture","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_architecture:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_architecture:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_architecture:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD Electrical","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_electrical:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_electrical:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_electrical:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD MAP 3D","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_map_3d:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_map_3d:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_map_3d:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD Mechanical","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_mechanical:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_mechanical:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_mechanical:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD MEP","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_mep:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_mep:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_mep:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD Plant 3D","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_plant_3d:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_plant_3d:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_plant_3d:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"Civil 3D","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:civil_3d:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:civil_3d:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:civil_3d:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"Advance Steel","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:advance_steel:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:advance_steel:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:advance_steel:2023:*:*:*:*:*:*:*"]}],"references":["https://www.autodesk.com/products/autodesk-access/overview","https://www.autodesk.com/trust/security-advisories/adsk-sa-2025-0003"],"weaknesses":["CWE-122"],"ingestedAt":"2026-10-29T20:08:39.238Z","source":{"repository":"CVEProject/cvelistV5","path":"cves/2025/1xxx/CVE-2025-1273.json","commit":"556c9d3a8cd17e218bb8e452ba7cd619a384ff47"},"raw":{"dataType":"CVE_RECORD","dataVersion":"5.2","cveMetadata":{"cveId":"CVE-2025-1273","state":"PUBLISHED","datePublished":"2025-04-15T20:56:04.970Z","dateUpdated":"2026-02-26T18:28:17.193Z","assignerShortName":"autodesk","assignerOrgId":"7e40ea87-bc65-4944-9723-dd79dd760601","dateReserved":"2025-02-13T15:16:28.058Z"},"containers":{"cna":{"title":"PDF File Parsing Heap-Based Overflow Vulnerability","descriptions":[{"lang":"en","value":"A maliciously crafted PDF file, when linked or imported into Autodesk applications, can force a Heap-Based Overflow vulnerability. A malicious actor can leverage this vulnerability to cause a crash, read sensitive data, or execute arbitrary code in the context of the current process."}],"affected":[{"vendor":"Autodesk","product":"Revit","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.4.1","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.3.2","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.7","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:revit:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:revit:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:revit:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD LT","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_lt:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_lt:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_lt:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD Architecture","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_architecture:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_architecture:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_architecture:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD Electrical","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_electrical:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_electrical:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_electrical:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD MAP 3D","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_map_3d:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_map_3d:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_map_3d:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD Mechanical","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_mechanical:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_mechanical:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_mechanical:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD MEP","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_mep:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_mep:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_mep:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"AutoCAD Plant 3D","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:autocad_plant_3d:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_plant_3d:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:autocad_plant_3d:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"Civil 3D","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:civil_3d:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:civil_3d:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:civil_3d:2023:*:*:*:*:*:*:*"]},{"vendor":"Autodesk","product":"Advance Steel","defaultStatus":"unaffected","versions":[{"version":"2025","status":"affected","lessThan":"2025.1.3","versionType":"custom"},{"version":"2024","status":"affected","lessThan":"2024.1.8","versionType":"custom"},{"version":"2023","status":"affected","lessThan":"2023.1.8","versionType":"custom"}],"cpes":["cpe:2.3:a:autodesk:advance_steel:2025:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:advance_steel:2024:*:*:*:*:*:*:*","cpe:2.3:a:autodesk:advance_steel:2023:*:*:*:*:*:*:*"]}],"references":[{"url":"https://www.autodesk.com/products/autodesk-access/overview","tags":["patch"]},{"url":"https://www.autodesk.com/trust/security-advisories/adsk-sa-2025-0003","tags":["vendor-advisory"]}],"metrics":[{"cvssV3_1":{"attackComplexity":"LOW","attackVector":"LOCAL","availabilityImpact":"HIGH","baseScore":7.8,"baseSeverity":"HIGH","confidentialityImpact":"HIGH","integrityImpact":"HIGH","privilegesRequired":"NONE","scope":"UNCHANGED","userInteraction":"REQUIRED","vectorString":"CVSS:3.1/AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H","version":"3.1"},"format":"CVSS","scenarios":[{"lang":"en","value":"GENERAL"}]}],"problemTypes":[{"descriptions":[{"cweId":"CWE-122","description":"CWE-122 Heap-Based Buffer Overflow","lang":"en","type":"CWE"}]}],"providerMetadata":{"shortName":"autodesk","orgId":"7e40ea87-bc65-4944-9723-dd79dd760601","dateUpdated":"2025-09-25T18:45:07.442Z"},"impacts":[{"capecId":"CAPEC-100","descriptions":[{"lang":"en","value":"CAPEC-100 Overflow Buffers"}]}],"source":{"discovery":"EXTERNAL"},"x_generator":{"engine":"Vulnogram 0.2.0"}},"adp":[{"title":"CISA ADP Vulnrichment","metrics":[{"other":{"type":"ssvc","content":{"id":"CVE-2025-1273","role":"CISA Coordinator","options":[{"Exploitation":"none"},{"Automatable":"no"},{"Technical Impact":"total"}],"version":"2.0.3","timestamp":"2025-04-18T03:55:34.685588Z"}}}],"providerMetadata":{"shortName":"CISA-ADP","orgId":"134c704f-9b21-4f2e-91b3-4a467353bcc0","dateUpdated":"2026-02-26T18:28:17.193Z"}}]}}}